31 March 2008
In the announcement made in Amsterdam, the company said the product ‘will become’ the next-generation DCS, pointing to a time in the future that the full system will be available. At the present, it works with I/O, controllers, and proprietary Vnet networking of existing systems. The announcement covered the HMI and database, which are the first two modules that have been released.According to Yokogawa senior VP Satoru Kurosu, Centum VP was designed for the next generation of engineers, that is, the generation that will soon replace the large number of present engineers and operators who will be retiring soon. Since the diminished number of personnel will have to be supplanted with an increased amount of automation, Yokogawa intends to provide its customers with a method to fill the gaps by integrating plant information management, asset management, and operation support functions. In this approach Yokogawa says it is going beyond the traditional DCS function of controlling and monitoring a plant redefining the role of the production control system.Database, HMIThe most tangible part of the announcement is the Human Interface Station (HIS). The new Microsoft Vista-based station is meant to introduce a unified and intuitive operating environment, designed and arranged to reduce operator fatigue and discomfort. The HMI is also designed to facilitate quick access to the right information, so that double the amount of operator work can be done in the same amount of time.The other major part of the announcement is the database. The unified architecture provided by a real-time plant database is intended to serve four key functions—production control and monitoring, plant information management, asset management, and operation support—at the same time. Yokogawa says competitors provide these functions, but only through a variety of different suppliers, which leads to ‘a patchwork of disparate systems, leaving gaps and barriers that constrain operations.’ With a unified plant database, Centum VP ‘enables single-source seamless integration of advanced applications that manage plant information, stabilise processes, and improve operational efficiency.’Figure 1: In 1988, Yokogawa introduced its Centum XL system, with the latest 32-bit RISC processors , surface mounted electronics, artificial intelligence workstations, and mouse and menu-driven touchscreen graphics. Eight CRTs were ‘stacked’ in a new configuration that gave operators a better view. The worldwide installed base at that time was 2,000 systems.
Print this page | E-mail this page
This isn't a paywall. It's a Freewall. We don't want to get in the way of what you came here for, so this will only take a few seconds.
Register Now