Proof testing: calibration by a different name?

13 March 2017

Today, the focus in the oil and gas industry is clearly on operational excellence – and many operators have already managed to dramatically reduce their operating costs dramatically. Andy Morsman discusses how this situation is affecting the world of calibration?

The fall in the price of oil has resulted in the delay or cancellation of many investment projects.  Additionally, a large proportion of the assets operating in and around the North Sea are having their operational lives extended beyond that originally designed.  Of course this is not limited to off shore rigs – the gas receiving plants that were built in the mid 1980s were designed using the ‘CRINE’ contact terms – essentially every part of the installation was selected under ‘lowest cost wins’ rules.  The result was the opposite of standardisation. A typical gas plant could have over 3,000 instruments, but from perhaps ten different manufacturers! 

Calibration of instrumentation used in regulatory control is mandatory – the introduction of ISO9001 made this very clear for any company using the standard as the basis of their Quality Processes. While ISO9001 has been revised, the task facing an instrumentation technician today is changing. In the past it was acceptable to calibrate every instrument on the plant annually when there was sufficient staff to calibrate 10 to 20 instruments every day.  Now Operational Excellence (OE) task teams are rightly asking questions such as can we make the instrumentation tasks more efficient, can we change the calibration intervals based on the risk of failure or inaccurate readings – can we do more with less staff?

Let’s just look at the variety of tasks being performed by instrumentation on an asset.  There are the day to day operations of the plant, the pressure, temperatures, flows and levels associated with wellheads, separators, compressors, injection systems etc. Then there are the fiscal measurements – those skids that result in tax being paid – so typically specialist flow rigs that measure the quantity and quality of oil and gas being shipped off a platform or received at an onshore plant. Traditionally, the task of calibrating fiscal and process instruments has been performed by two completely separate teams – and often separate contractors. 

Safety systems are increasingly becoming totally integrated with their associated Process Control Systems – although there is typically separate hardware and instrumentation, the user interface is similar or even the same.  The Safety Integrated System (SIS) is designed to ensure a process goes to a safe condition if a critical event occurs that could lead to an unsafe condition or even a catastrophic event, such as an explosion or a uncontrolled pollution event. ISO61511 is used to define the design, installation, operation (and decommissioning) of safety systems, but in practical terms this means that instrumentation engineers are legally required to test the operation of the safety systems loops and record the information, making it available for inspection by a government agency. In many respects it is very similar to the regulations faced by instrumentation engineers in the pharmaceutical industry, where the emphasis is on electronic signatures, the competence of staff and integrity of data. 

Proof testing
In terms of instrumentation, the proof testing tasks are very similar to a typical calibration, but the key difference is in the frequency of the testing.  Of course, the risk-based approach to having an instrument calibrated on its due date is desirable, but it is not exactly critical. With an SIS proof test it is the exact opposite – the test intervals will very likely vary from loop to loop.  Each loop is designed to meet a particular Safety Integrity Level (SIL) determined by the possible effect of a critical failure.  Each element of the loop, each instrument, valve and switch will have been designed and manufactured to meet the required SIL. However, it all depends on the proof testing interval of the instrument as defined in the safety manual.  So an instrument from vendor A will meet for example SIL2, but requires to be tested annually, but another apparently similar instrument from vendor B (hidden in the small print of the safety manual) may require testing every three months in order to meet its SIL, and often loops are designed to have similar instruments from different vendors remove any systemic failure modes.

While IEC 61511 applies to SIS, there is also the task of the inspection and testing of all the control and instrumentation infrastructure in hazardous areas.  The regular inspection of Ex rated switches, junction boxes, safety showers, etc. is now covered by IEC60079-17.  Again the emphasis is on the legal requirement – not just to perform the inspections but to be able to prove the inspections have been carried out.  Often the inspections are visual only to record the condition of the item and raise a corrective work order if necessary.

An obvious similarity
There is an obvious similarity in the requirements of all these various calibrations, proof tests and inspections.  So the question is can we take the multiple standard operating procedures documents, put them in an electronic form that we can carry around the platform and efficiently perform the tasks, recording the results and transfer them back to SAP or similar?

While the majority of oil and gas customers are currently using separate teams or contractors to perform these tasks, you can see why several companies are ‘rationalising’ the workforce – making fewer technicians perform more and varied tasks.  It makes a great deal of sense, therefore, if they are all able to use the same tools, hardware and software, to not perform calibrations, maintenance checks and proof tests, and probably more importantly from an operations point of view, to have the resulting records readily available and traceable. 

Andy Morsman is the business development manager for Beamex Ltd in the UK.