06 August 2007
The systems, installed at the Bidston Moss garden waste recycling centre, will contribute to the authority’s target to process 10,000 tonnes of waste a day.Denca provided control for recycling plant temperature levels, temperature pressure, and hydraulic oil and filter blockage detection.John Talbot, a managing director of Denca, said he was delighted his company had been chosen by Primary Fluid Power and VCU Europe to be involved in the project. He added: “Denca offers considerable control systems expertise to manufacturing industry across all sectors, and we are pleased to be provided with the opportunity to assist in bringing significant enhancements to this most important green waste recycling plant.
Print this page | E-mail this page
This isn't a paywall. It's a Freewall. We don't want to get in the way of what you came here for, so this will only take a few seconds.
Register Now